Industrial Equipment Company Relaunches Lean Enterprise-Wide, Improving Inventory, Lead Times, and Flexibility

An American industrial equipment manufacturer saw its Lean manufacturing efforts stall, leaving improvement work disconnected from growth objectives—and eroding its competitive advantage.

The company needed to restart lean efforts and elevate operational excellence to the enterprise level so improvement work could support strategic growth, improve competitiveness, and better align operations with customer demand. Working with TBM, the company built a more integrated operating model spanning production, suppliers, and product development.

Challenge

Siloed initiatives and weak accountability left the company misaligned with growth objectives, requiring a structured relaunch to restore focus, improve execution, and strengthen market responsiveness.

The company had drifted into siloed operations—initiatives ran in isolation, disconnected from enterprise priorities, with limited accountability for strategic growth. It needed a structured relaunch to realign efforts around critical objectives and establish enterprise-wide ownership of key KPIs, including quality improvement, inventory reduction, and stronger supplier performance—while increasing flexibility in new product development.

At the same time, leadership sought to better connect product decisions to customer needs, improving market responsiveness and reinforcing its competitive edge.

Solution

A comprehensive Lean transformation aligned operations, suppliers, and product development around a unified system. Improved flow, execution, and customer-focused innovation.

TBM helped the company create a tailored Production System and establish a centralized continuous improvement office to drive alignment, sustain momentum, and support execution across the organization. The company was reorganized into process-oriented value streams to improve flow, accountability, and coordination across operations.

The lean manufacturing transformation also included strategic supplier management, supplier co-location, pull-system implementation for sheet metal parts, and broader efforts to reduce scrap and rework. In product development, the team implemented Design for LeanSigma and used Voice of Customer insights to increase speed to market and focus products more closely on customer needs.

Results

The transformation delivered significant financial impact—including $1.3M in cost avoidance—while improving capacity, reducing inventory, accelerating lead times, and strengthening alignment with customer needs.
  • $1.3 million in cumulative new-hire cost avoidance while meeting a 30% increase in demand with no new hires.
  • $2.8 million in inventory reduction through supplier management, supplier co-location, pull-system implementation, scrap and rework improvement, and kitting.
  • 8–28% cycle-time reductions and 60–75% lead-time improvements, increasing flexibility and responsiveness.
  • Improved lead times that enabled the company to bring fabrication and welding in-house.
  • Better alignment to customer needs through Voice of Customer, helping customers work more effectively on the job site.

Learn more about how we help companies in the industrial manufacturing industry. 

Frequently Asked Questions

How can a manufacturer restart a stalled lean or operational excellence program?
A stalled lean program is usually a sign that efforts were project-based rather than system-based. To restart, leadership needs to clarify the business case, define a simple operating system that connects strategy to daily management, and re-establish visible performance routines at the value-stream level. This often includes standard work for leaders, tiered meetings, and a small number of high-impact improvement projects that deliver quick, measurable wins to rebuild momentum and credibility.
What are practical ways to reduce inventory without hurting customer service?
Reducing inventory without hurting service requires improving flow, not just cutting stock levels. Manufacturers typically focus on stabilizing demand signals, implementing pull systems or kanban for key components, working more closely with strategic suppliers, and attacking scrap, rework, and changeover issues that drive variability. When flow improves and replenishment is more reliable, safety stocks can be systematically reduced while maintaining or even improving on-time delivery.
How can companies handle double-digit demand growth without adding headcount?
To support significant demand growth without increasing headcount, companies have to unlock capacity hidden in existing processes. This usually comes from reducing changeover times, eliminating non-value-added activities, improving equipment reliability, balancing workloads across value streams, and addressing quality issues that cause rework. When combined with better planning and scheduling, these improvements increase effective capacity so more volume can be produced with the same team.
What role does supplier performance play in operational excellence and cost reduction?
Supplier performance directly affects inventory, lead time, quality, and total cost. High-performing suppliers with stable processes and short lead times allow manufacturers to carry less inventory and respond faster to customer needs. Improving supplier performance often involves joint problem solving, co-location or closer physical proximity, shared planning data, and clear expectations for quality, delivery, and continuous improvement.
How can companies bring more manufacturing processes back in-house successfully?
Bringing work back in-house requires both capability and capacity. Companies first need to ensure the right skills, equipment, and process controls are in place to produce reliably. They then must free up capacity through productivity improvements, better scheduling, and reduced changeovers. When the internal operation is stable and efficient, insourcing can improve lead time, quality control, and total cost compared to external sourcing.
What kind of results can manufacturers expect from a holistic operational excellence transformation?
When operational excellence is approached as a holistic operating system rather than a set of isolated tools, manufacturers typically see improvements in multiple dimensions at once. Common outcomes include reduced inventory and working capital, lower conversion costs, shorter cycle and lead times, improved on-time delivery, better quality, and increased flexibility to handle demand swings. Over time, these gains support profitable growth, stronger customer relationships, and a more engaged workforce.

Topics in this Case Study

At a Glance

Client

American manufacturer of heavy equipment such as cranes and excavators

Results

  • $2.8 million in inventory reduction
  • 8–28% cycle-time reductions
  • 60–75% lead-time improvements
  • $1.3 million in cumulative new-hire cost avoidance while supporting a 30% increase in demand with no new hires
  • Improved responsiveness and lead-time enough to bring fabrication and welding in-house

Win Faster with TBM.

Let’s start a conversation about operational speed.